eRG 21 T hybrid

The eRG 21 T hybrid is the hybrid version of our most powerful pile driver with telescopic leader. Thanks to its high permissible torque, large effective length and high tractive forces, this machine is also suitable for heavy drilling work.

Available with all our RTG innovations:

  • Automatic Coupling System ACS
  • Rotatable and adjustable 60 kN auxiliary winch with ballast lowering function
  • EEP (Energy-Efficient Power)
  • Operation remote control for all functions
  • Sheet pile assistant

MR 150 AVM

Max. vibrator size

21.0 m

Max. piling material length

518 kW

Max. engine performance